Sunday, December 24, 2006

S&H City Hall pavers

Existing rear patio had about 2000 S&H City Hall pavers, which are water-struck bricks that are kind of pretty and practically indestructible. So we saved them on pallets in the back yard.

Perennial rescue successful




AfterBefore


The plantings are wintering in the back yard, and large rhododendron from the back has moved to our neighbors.

Site plan

Here's the plan for the site, showing the new house superimposed on the existing house. The front face of the new house, excluding the porch, is approximately in line with the existing.

The biggest change is the new foundation, although about the same 25' width as the existing, will be located 6' further south. If you look at the current house from across the street, you can see this move makes visual sense. It also makes the landscaping easier on the driveway side, where there's a fairly steep pitch down to the driveway, and on the southwest corner, which is where the back door will be.

Even on the narrow lot, all sides are well within required setback dimensions.

Wednesday, December 20, 2006

Kitchen elevations

Here are simulated views of the kitchen - first the north side:


Then the south side, looking through to the family room. The "magic" refrigerator has a deeper interior than exterior (like Mr. Weasley's car in Harry Potter...), thanks to the extra wall depth at the inter-module boundary.


And the view through the kitchen to the back yard:

Plans

Here are plans of the first and second floor. These were done with a consumer architectural program (the Better Homes and Gardens one, version 6.0), and aren't exactly accurate, but they're pretty close. We used this to help visualize design decisions.


On the second floor, I think there's probably a door for that closet :-), and the roomlet next to it is a laundry room.

Permit applications filed

Our permits for demolition and building are complete and under review. We've postponed demolition until the building permit is granted, partly to make sure we have zoning approval, partly to optimize the use of the excavator. The same machine used for demolition can stay on site for the day or so it takes to inspect the cleared site and get final approval of the building permit, then can proceed with excavation.

The only zoning uncertainty was that our lot is only 60 feet wide, and is supposed to be 80 feet per a 1940 statute. But the lot dimensions have never changed, and we've spoken with the head of Newton zoning who says there shouldn't be a problem.

Sad day for spruce tree

The tree was taken down Friday morning. Took about an hour, with a tall crane. The 14-inch logs at the base are shown here. The logs and branches 10-inches and less were ground up by a monstrous machine.

73 years in the life of a tree


By my count, the spruce tree was 73 years old, so it was planted 7 years after the house was built in 1926.

Soil drainage test successful

Our surveyor Frank Iebba said the soil is fine, just sand and gravel (*). They actually had trouble with the perc test pit collapsing. Newton nominally requires us to build an elaborate drainage system of plastic pipes routed from all the gutter downspouts to a large concrete drywell in the backyard. Based on the soil, and a basement that's been dry since 1926, we really don't need to do this; perhaps we can work out a suitable compromise.

(*) the landscaper who put in the front retaining wall a couple years ago hit sand several feet down, and immediately halted digging; he thought it might be the warning sand that the gas company sometimes backfilled gas lines with. "No," I said, "around here we call that topsoil."

Wednesday, December 13, 2006

Activities this week

Thursday: water/sewer disconnect

Landscaper will be moving tree and perennials from front garden.

Friday: Surveyor/Engineer will be conducting soil drainage test in back yard.

Friday: Large spruce tree on side of current house will be taken down. That tree is almost exactly where our new back door will be in the new house.

Saturday: asbestos removal

Recycling scrap metal

Our house has a lot of metal in it: the boiler, pipes and radiators, copper supply pipes, copper wire. There must be a couple tons at least.

Normally, when a house is demolished, it all goes into the landfill - wood, metal, glass, lead paint, and all. I want the metal to be recycled, just on general principle, and I found a removal firm that will do that. At first Newton said we couldn't do it without the demolition permit, but now they say it's OK, so we've scheduled that for Tuesday.

Demolition permit

I spoke with our inspector Bill Case yesterday, and have a much better understanding of the permitting process.

Once the water disconnect and asbestos removal is done, we can get a demolition permit any time, "over the counter". So we could do this anytime after Saturday.

Getting the building permit, however, might take 2 weeks, for zoning review and drainage review. We need to get that application in ASAP, but it doesn't have to be granted for demolition to proceed.

The ideal setup is to have the building permit filed early, so that excavation can proceed as soon as demolition is certified complete, while the machine is still on-site.

Wednesday, December 6, 2006

House under construction!

MSI started building the house on Monday. It will be built in two weeks by 45 guys on a factory floor in Pennsylvania. Scheduled delivery is Jan 17.

All I want for Christmas is a building permit.

Asbestos delay

We discovered asbestos pipe wrap in the basement (corrugated paper stuff under fiberglass), which needs to be removed before demolition. It's a small job (1/2 day), but there's a mandatory 10-day waiting period before it can be done. That will delay our demolition until at least Dec 20.

No idea what the motivation is for that notification period. Most other states waive the requirement for residential projects, so it was probably intended for large-scale industrial asbestos clean-up. You would think the policy objective would be to make proper asbestos cleanup as easy and inexpensive as possible.

Module placement plan

Derba and Heinlein and I met with the module setting representative from MSI, and the crane operator (Pick Construction) last Wednesday, to figure out how to get the modules in place. There are 4 modules: 2 are 44' long and 14' wide, and 2 are 47' long and 12' wide. Tight fit! Fortunately our street is 34' wide, so we can successfully back them down our driveway.

The 75-ton crane is almost 40' long, and will go in the front yard. To get there, it needs to drive over the nice new wall and garden we built a couple years ago (when we thought the equipment would go in the back yard). So we need to stage a perennial rescue mission, particularly for the stewartia and azaleas, and the only rose I've successfully grown.

But the good news is that the modules can definitely be placed successfully, and all 4 can be placed in one day.