Tuesday, March 13, 2007

Basement floor

The concrete slab for the basement floor was poured yesterday. Here's the view down the basement stairs:

And the result by the end of the day.

The cool thing about buying yard after yard of concrete is you get to write your name in it...
Posted by khs at 7:26 AM
Newer Post Older Post Home

Links

  • Project genesis
  • Before - the existing home
  • Proposed - our new home
  • Demolition movie
  • Module setting movies

Blog Archive

  • ►  2008 (4)
    • ►  July (2)
    • ►  June (1)
    • ►  January (1)
  • ▼  2007 (91)
    • ►  June (1)
    • ►  May (8)
    • ►  April (15)
    • ▼  March (18)
      • Old house to new
      • Exterior almost done
      • Roofing and trim
      • New boiler
      • Front porch
      • Nice surprise
      • KHS back from London
      • Basement floor
      • Ipe porch floor
      • Roof trim detail
      • Window trim detail
      • Heating system capacity
      • Heat loss calculation
      • Siding and Trim
      • Basement still full of snow
      • Kitchen sink
      • Utility reconnection stumbles out of the gate
      • Movies for Macs
    • ►  February (34)
    • ►  January (15)
  • ►  2006 (18)
    • ►  December (15)
    • ►  November (3)

About Me

khs
Newton, Massachusetts
View my complete profile