Sewer pipe will be installed Thursday and Friday. Water pipe will be installed Saturday, and street patched on Monday. Gas will be installed next week (small hole on other side of street), as will electric (overhead).
These one-day jobs each take two days because we're required to fill the street with concrete afterward, and it has to set overnight. 47 yards of concrete at $80 per, adding about $5000 to the job for no good reason at all. If the fill under the street is anything like our soil (class 1 sand/gravel) we'll use it for subsoil.