skip to main
|
skip to sidebar
New House in Waban
Documents construction of our new modular house in Newton, Massachusetts.
Tuesday, February 27, 2007
Back view
Here's the house from the back. The left (north) side has the kitchen, with guest room above.
Newer Post
Older Post
Home
Links
Project genesis
Before - the existing home
Proposed - our new home
Demolition movie
Module setting movies
Blog Archive
►
2008
(4)
►
July
(2)
►
June
(1)
►
January
(1)
▼
2007
(91)
►
June
(1)
►
May
(8)
►
April
(15)
►
March
(18)
▼
February
(34)
First sunset
First look: kitchen
First look: family room
First look: living room
Button it up on Friday
Back view
Last module down
Electrical interconnection
South elevation with dogwood
New movies
Joe Derba wins tractor pull!
Repaired shipping damage
Module setting movie, take 1
Two down, two to go
Great day for Up!
Don't try this at home
Electrical panel installed
Stairway to heaven
Sneek peek at kitchen
Big trucks
Wednesday's the day
Pit stop :-)
Another weather delay
Derba Construction
Overdesigned drainage system
Modules rescheduled for Thursday
Basement with a view
Too cold, postponed delivery
Ready for backfill
Delivery on Wednesday
New toy - Panoramic photos
Foundation poured
Footings done
1-888-CURE-ALS
►
January
(15)
►
2006
(18)
►
December
(15)
►
November
(3)
About Me
khs
Newton, Massachusetts
View my complete profile