skip to main | skip to sidebar

New House in Waban

Documents construction of our new modular house in Newton, Massachusetts.

Tuesday, February 27, 2007

First look: kitchen

Entering the kitchen from the front, looking through to the back:



Panoramic view of south side, standing in front of sink:



Panoramic view of north side, standing in front of stove (not installed yet):

Posted by khs at 10:32 PM
Newer Post Older Post Home

Links

  • Project genesis
  • Before - the existing home
  • Proposed - our new home
  • Demolition movie
  • Module setting movies

Blog Archive

  • ►  2008 (4)
    • ►  July (2)
    • ►  June (1)
    • ►  January (1)
  • ▼  2007 (91)
    • ►  June (1)
    • ►  May (8)
    • ►  April (15)
    • ►  March (18)
    • ▼  February (34)
      • First sunset
      • First look: kitchen
      • First look: family room
      • First look: living room
      • Button it up on Friday
      • Back view
      • Last module down
      • Electrical interconnection
      • South elevation with dogwood
      • New movies
      • Joe Derba wins tractor pull!
      • Repaired shipping damage
      • Module setting movie, take 1
      • Two down, two to go
      • Great day for Up!
      • Don't try this at home
      • Electrical panel installed
      • Stairway to heaven
      • Sneek peek at kitchen
      • Big trucks
      • Wednesday's the day
      • Pit stop :-)
      • Another weather delay
      • Derba Construction
      • Overdesigned drainage system
      • Modules rescheduled for Thursday
      • Basement with a view
      • Too cold, postponed delivery
      • Ready for backfill
      • Delivery on Wednesday
      • New toy - Panoramic photos
      • Foundation poured
      • Footings done
      • 1-888-CURE-ALS
    • ►  January (15)
  • ►  2006 (18)
    • ►  December (15)
    • ►  November (3)

About Me

khs
Newton, Massachusetts
View my complete profile