Foundation is ready to be backfilled Monday morning. The white pipes are the drains for the roof - Newton requires any new house to be able to drain a rainstorm of 6" per day without flow into adjacent properties. Not really a problem through our sandy soil.
After backfill Derba will build the kneewalls (wooden parts of the foundation) on Tuesday, then kick back for a couple days while the crane operator and setting crew place the modules.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment